Sussex Asphalte were employed by our long standing client Crowther Overton Hart Surveyors to undertake the resurfacing of this 260m2 asphalt terrace and walkway.

Sussex Asphalte were employed by our long standing client Crowther Overton Hart Surveyors to undertake the resurfacing of this 260m2 asphalt terrace and walkway.

PROJECT OVERVIEW

Sussex Asphalte were employed by our long standing client Crowther Overton Hart Surveyors to undertake the resurfacing of this 260m2 asphalt terrace and walkway. Mastic Asphalt was chosen for its durability and performance, given the heavy foot traffic that the area will receive, grey striated GRC promenade tiles were chosen to protect the newly laid mastic asphalt and enable residents to use garden furniture etc without risk of damaging the asphalt The existing defective asphalt coverings were stripped back to concrete deck and a new warm roof system installed.

PROJECT CHALLENGES

As the terrace is above commercial shops and the terrace also provides direct access to residential properties it was imperative not to compromise any internal water ingress to properties below as well as keeping access available to residents at most times. , so our charge hand and operatives had to take the upmost care with regards to health and safety and the moving and laying of molten asphalt around the public whilst keeping residents and client up to date with the progress of the project.

PROJECT MATERIALS

IKO Permaphalt Mastic Asphalt
The build up was a IKO felt vapour control layer and we insulated with a 50mm PIR insulation board using 25mm board for the gutter that we fashioned at the front edge of the terrace, followed by two coats of mastic asphalt, solar reflective paint and GRC promenade tiles on the walkways

At a Glance

  • IKO Permaphalt Mastic Asphalt
  • 20 Year Guarantee
  • TR27 50mm Enertherm insualation
  • 230m2
Enquire

"Excellent workmanship, good/decent down to earth people, nice to get along with, professional outfit in terms of uniform, ppe, vans, tools… overall you know you are getting a job done well and can rest assured."

Recent Projects

Cricketers
Parade

Cricketers Parade

Sussex Asphalte were employed by our long standing client Crowther Overton Hart Surveyors to undertake the resurfacing of this 26om2 asphalt terrace and walkway.
Read more

PDF Download (Full Specification)

If you would prefer your own copy of the above case study with full specifications, please complete the below form and a PDF download link will be provided for you.

Thank you for completing the form. Please click below to download your PDF Case Study.
Download PDF
Oops! Something went wrong while submitting the form.