Blatchington Mill School

The project involved stripping the existing asphalt waterproofing to the structural wood decking ready for the installation of the new Garland UK 3 layer felt system.

The project involved stripping the existing asphalt waterproofing to the structural wood decking ready for the installation of the new Garland UK 3 layer felt system.

PROJECT OVERVIEW

This project was undertaken as part of the Brighton and Hove City Council Planned Maintenance Framework in the Summer of 2023.

The project involved stripping the existing asphalt waterproofing to the structural wood decking ready for the installation of the new Garland UK 3 layer felt system.

The new system incorporated a full tapered system across all 4 separate roof sections to allow the water to drain off the roof or to the required outlets. Other works associated with this project were the installation of new hardy plank cladding, ballasted freestanding edge protection new soffits/fascias and a new UPVC door the achieve the correct upstand height of 150mm from finish roof level.

PROJECT CHALLENGES

Sussex Asphalte executed all four-roof sections totalling 253m2 within the 6-week summer holiday period whilstcontending with the wettest summer in the UK for decades.

PROJECT MATERIALS

Garland Reinforced Bitumen Membrane
Garland Stressply Flexplus Cap Sheet; Torch Flex Vapour Barrier; PIR insulation scheme; Torch Flex Ultra
vent

At a Glance

  • Garland Reinforced Bitumen Membrane
  • 20 Year Guarantee
  • 253m2
Enquire

PDF Download (Full Specification)

If you would prefer your own copy of the above case study with full specifications, please complete the below form and a PDF download link will be provided for you.

Thank you for completing the form. Please click below to download your PDF Case Study.
Download PDF
Oops! Something went wrong while submitting the form.